This is our power pole, which happens to sit just outside the proposed arena (I think I'll have to wait a while for the arena) I am going to have two spot lights put on this pole to enable me to ride in the dark in winter :-).
Tuesday, December 22, 2009
Saturday, December 19, 2009
Wednesday, December 16, 2009
Floor Plan
Tuesday, December 15, 2009
We have the best builder!!!
I worked out last week that from the first soil turned (to level the block) until lock up it was approx. 8 1/2 weeks. I think that has to be some kind of a record, and one might think that the quality has suffered but it definitely has not.
I can't believe how easy our builder is to deal with and every dealing with him makes me incredibly happy that I didn't go with a "big" corporate builder.
I can't believe how easy our builder is to deal with and every dealing with him makes me incredibly happy that I didn't go with a "big" corporate builder.
Kitchen
The amount of light coming through from the splashback is amazing, it doesn't seem that bright.
Here's our very first dishwasher, a Bosch, our previous model was Andrew :-)
Here's our very first dishwasher, a Bosch, our previous model was Andrew :-)
It'll be good when the snazzy oven goes into this space :-). Thank goodness Kim was around when our correct oven was delivered yesterday as on Sunday we were given the wrong oven and Andrew and I had struggled to get it into the house to find we had been given the wrong one :-).
External photos (more :-))
Monday, December 7, 2009
Subscribe to:
Posts (Atom)